STE Design Capability

qksj
摄图网_600236537_工业电力管道方案设计(非企业商用)
sj

Applicable Software List

No. ltem Description
1 Auto CAD 2Dand 3D
2 Auto CAD Plant 3D P&ID P&ID
3 Auto CAD Plant 3D 3D, layout and lsO drawing
4 Autodesk Inventor 3D for Equipment
5 Soildworks 3D for Equipment
6 Tekla
Detail design for steel structure
7 PKPM/Midas Gen/STAAD.Pro
Stress analysis for steel structure
8 TIA portal V14 Programming for control system
9 Wincc flexible 2008 Programming for touch screen
10 SW6 Strength calculation for process equipment
11 PV Elite Pressure vessel design
12 CAESARII Pipeline stress analysis
tu1

STE Project Reference

Client VISIONBLUE 200T project storage bin + processing bin
Description 200T project storage bin + processing bin
Duration 200T project storage bin + processing bin
Work Scope Detail design as per P&ID;Manual Valves supply;
Fabrication and assembly.
蓝景
Client Domestic famous power cable
Description Combustion valve manifold
Duration Sep.2024-Mar.2025
Work Scope Detail design as per P&ID. +Manufacture
安徽天康
Client A supplier of energy equipment and solutions for the real estate industry
Description Heat pump skids
Duration Aug.2024-Nov.2025
Work Scope Detail design as per P&ID. +Manufacture
LAVA
Purification device membrane skid
Client International famous chemical company
Description
Duration Aug.2024-Feb.2025
Work Scope Detail design as per P&ID. +Manufacture
Solvay
Client Domestic famous electrical engineering research institute
Description Solid-state hydrogen storage skid/Cold water heat transfer skid
Duration Aug.2024~Dec.2024
Work Scope Detail design as per P&ID.
中电工研
Client One of the largest specialist fire companies in Europe
Description Deluge valve skid
Duration Apr.2024-May.2024
Work Scope Equipment develop the DWG drawings
美力马
Client Taiwan's famous chemical enterprise
Description Taiwan hydrogen compressor
Duration Apr.2024-Nov.2024
Work Scope Detail design as per P&ID. +Manufacture
PDC
Client Domestic famous new energy company
Description Hydrogen filling cabinet skid / Hydrogen cabinet skid
Duration Mar.2024-Aug.2024
Work Scope Detail design as per P&ID. +Manufacture
美源
Client Domestic famous new energy company
Description hydrogen combiner discharge
Duration Feb.2024-Mar.2024
Work Scope Equipment develop the DWG drawings
舜华新能源
Client Local Industrial Gas Supplier
Description Hydrogen filling cabinet skid / Hydrogen cabinet skid
Duration Jan.2024~Aug.2024
Work Scope Detail design as per P&ID.
上海跃绅
Client
Well-known Institute in Aerospace Industry
Description
Qil Remove System for Cold Box
Duration
Aug. 2020~Apr. 2021
STE Scope
Detail design as per P&ID; Valves supply;
Fabrication and assembly.
a
Client
World Leading Industrial Gas Supplier
Description
Cold Box
Duration
Feb. 2020~Jul. 2020
STE Scope
Detail design as per P&ID; Valves supply;
Fabrication and assembly.
b
Client
Local Industrial Gas Supplier
Description
Nitrogen generator Warm Skid
Duration
May. 2021~Aug. 2021
STE Scope
Detail design per P&ID; Fabrication and assembly.
c
Client
Well-known Chinese Industrial Gas Supplier
Description
Nitrogen generator Warm Skid
Duration
Jun. 2021~Oct. 2021
STE Scope
Detail design as per P&ID; Manual Valves supply;Fabrication and assembly.
d
Client
Well-known EPC Contractor
Description
Chemical Injection Package (11 sets)
Duration
Mar. 2018~Dec. 2018
STE Scope
Detail design as per P&ID; Main equipments(Pumps/Valves/Agitator,etc) and Instrumentation supply;Vessels fabrication(in compliance with ASME U);Assembly.
e
Client
UK Based Sustainable Energy Solutions Company
Description
Engineering Sevice for Moduel
Duration
Oct. 2022~present
STE Scope
Detail Design per P&ID
f
Client
World Leader in High Technologies for the Gas Field
Description
Pretreatment Skid;MP Dring & Qil Removal Skid;Membranes Skid
Duration
Dec. 2020~May. 2021/ Jan. 2022~Aug. 2022Jun. 2022~Feb. 2023
STE Scope
Detail design per P&ID; Manual Valves supply;Fabrication and assembly.
1
2
3
4
5